Roughed in the plumbing, rewired the lights and outlets, secured the sub-floor, and covered the floor in mud. What does this all mean besides the bathroom re-mod is getting done?
I can go with a clear conscience and gotta wait 24 hours for the floor to dry

.
Add me to the list I will be there!
